Plumbing

Comments

I’m feeling like maybe I should have become a plumber, as I’m getting pretty good at figuring out what’s going on behind my shower (in ways that the plumbers who actually came out to look at it and give estimates on seem to have missed). It looks like the problem is just with the connection between the shower head and the valve. It’s possible that with the right tools it’d be possible to just open up the wall a little bit to gain access to the valve side of the pipe to tighten (and maybe re-tape) it, and then the shower head end might only need the drywall to be opened up to have that connection tightened as well. I might not need any retiling at all! That would be ideal, at least.

Anyway this is stuff to go over with the plumber next week.

The plumber who did the “quick fix” and diagnosis on tuesday, incidentally, made a couple of things a lot worse, and I just ended up having to replace my tub spout as well (because he installed it with loc-tite on the faucet end for some reason, even knowing that this was meant to be a temporary fix). Oh well, the one I replaced it with is much nicer looking. The pipe leading to it is a little bit too long now, though. Do I need to cut it down and get a threading tool or something?

Another bathroom update

Comments

Got a second estimate from a plumber today. This one did a much more thorough diagnosis than the first one and he determined that there is definitely a leak between the valve and the tub spout, and pointed out some definite problems left by the contractors. This was a pretty thorough amount of work that took a few hours and cost a chunk of money, but that’ll make the estimation from the remaining plumber (who will be coming on Thursday) a lot more straightforward.

Today’s plumber estimates that the necessary plumbing work will be around $3000, plus however much it costs to redo the tiling. He said there’s tilers that his company works with which might work well although scheduling is difficult at present. And they’d be able to limit the amount of tiling work that needs to be redone, at least.

Anyway on Thursday I should have the final estimate for the plumbing stuff and then I can try working with the bathroom contractor in terms of who’s paying for all this. Or maybe he’d be able to prove the quality of his new crew by doing it for free but I’d have no reason to trust him to do a good job at this point.

Ugh.

Bathroom update

Comments

This morning’s shower with the exposed drywall confirmed that there is definitely a leak, on the output side of the valve.

Some tile is going to have to be removed and reinstalled. I guess I need to start looking at bathroom contractors again.

I do not need this right now

Comments

There is a fucking leak in the wall behind my bathtub

It is probably yet another fucking hurrah from the shitty goddamn bathroom remodeler folks

It is going to be fucking expensive to fix

Maybe the plumbers will be able to get at the pipes from the side but I’m not optimistic about that

This leak has probably been there for a while but it’s taken this long to be apparent, because it was slowly eroding away the drywall next to the tub and causing the baseboards to swell up

I suspect I’m going to need to sue the contractor for gross negligence

At least I still have plenty of tile left over from the renovation, in case the worst comes to pass and I need to get that wall redone

anyway this guy fucking sucks

I did the thing

Comments

The plan went pretty much according to keikaku1.

IMG_6335.jpeg

I had difficulty finding the studs because there’s some particleboard behind the drywall for some reason. Maybe some half-assed attempt at a moisture barrier or something? It was pretty obvious that it was there since it was visible through the light wiring hole. I ended up using some neodymium magnets to locate some drywall screws and then verified it by drilling pilot holes. I’m not absolutely certain that they’re screwed into studs but there’s a lot more support than there was before, and those screws are at least held tight to the wall.

On the left anchor I thought I’d messed up and that there actually was a stud behind it, somehow, and I started to patch it up so that I could screw in a construction screw instead (which is why there’s plaster on the left hole in the first picture), until I remembered, oh yeah, there’s weird backing board behind some of the drywall. So I drilled a smaller pilot hole and, yep, it went through easily, so yeah, it needed an anchor after all. (I mean I already knew that based on what had happened previously, but, still.)

Also I couldn’t find the nice toggle anchors I’d bought a couple years ago, so I ended up buying some similar ones at Home Depot. Which aren’t nearly as nice. A couple of them ended up breaking off and falling into the wall, and they were just kinda not-great to work with in general. But they did their job, and everything’s tightly screwed down.

Leveling the cabinet was a pain in the ass. It’d have been a lot easier if I had someone to help me but I was being stubborn about just getting this done.

Also, I didn’t need to do any painting, as all of the paint damage happened to be behind the cabinet. Nice.

Hopefully this time it stays up for more than two years!

IMG_6341.jpeg

Also I decided to be fancy and whipped up a custom centering jig to draw the centerline for drilling the holes in the hardwood. It was absolutely overkill but it didn’t take me long to do. I’ll probably post it as a customizable object on thingiverse/printables or something.

Bathroom remodel, day… wait what

Comments

Remember how two years ago I got my bathroom remodeled and it turned into a ridiculous ordeal that lasted well over a month of me living in a hotel and, later, a temporary apartment due to the repeated incompetence of the workers involved? And then it eventually finished up and it was good enough? Aside from some later issues which were easily fixed by myself?

So, about that…

Read more…

Bathroom followup

Comments

Wellp, now there’s water that leaks out from around the base of my toilet when I flush it.

I am guessing that the plumber didn’t replace the wax ring.

Sigh.