Kitchen day 7, things coming together

Huge progress. All of the cabinets are in the right place, the range hood is installed in a way that DOESN’T have spikes coming up from my living room floor, and the electrician also came and finally updated my outlets to GFIs (which I’ve only been putting off for the past 8 years) while also adding the switched outlet for the under-cabinet lights.

IMG_1350.jpegIMG_1351.jpegIMG_1352.jpegIMG_1353.jpegIMG_1354.jpegIMG_1355.jpegIMG_1356.jpegIMG_1357.jpegIMG_1358.jpegIMG_1359.jpegIMG_1360.jpegIMG_1361.jpegIMG_1362.jpeg

Read more…

kitchen day 6

No real progress today, instead the contractor came and looked over the installation variances from yesterday and we formulated a plan to fix everything. Mostly just took down the range hood (and settled on a new solution with HUGE thanks to Spud for some much-appreciated unsolicited design work), and two of the base cabinets got moved 3" to the left. Oh and the hole in the wall next to my phone got bigger.

IMG_1335.jpegIMG_1336.jpegIMG_1337.jpeg

Read more…

First major mess-up of the remodel! (day 5)

It wouldn’t be a kitchen remodel without some major screw-up, right? Well today one finally happened.

IMG_1302.jpegIMG_1303.jpegIMG_1304.jpegIMG_1305.jpegIMG_1306.jpegIMG_1308.jpegIMG_1309.jpegIMG_1310.jpegIMG_1311.jpegIMG_1312.jpegIMG_1313.jpegIMG_1314.jpegIMG_1315.jpegIMG_1316.jpegIMG_1317.jpegIMG_1318.jpegIMG_1319.jpegIMG_1320.jpegIMG_1321.jpegIMG_1322.jpegIMG_1323.jpegIMG_1324.jpegIMG_1325.jpegIMG_1326.jpegIMG_1327.jpegIMG_1328.jpegIMG_1329.jpeg

Read more…

Kitchen remodel day 4

Ah, I thought that was going too smoothly.

What’s the old saying? Measure twice, cut once?

IMG_1277.jpegIMG_1278.jpegIMG_1279.jpegIMG_1280.jpegIMG_1281.jpegIMG_1282.jpegIMG_1283.jpegIMG_1284.jpegIMG_1285.jpegIMG_1286.jpegIMG_1287.jpegIMG_1288.jpegIMG_1289.jpegIMG_1290.jpegIMG_1291.jpegIMG_1292.jpegIMG_1293.jpegIMG_1294.jpegIMG_1295.jpegIMG_1296.jpegIMG_1297.jpeg

Read more…

Kitchen remodel day 3

Partial cabinet installation! It’s starting to look like something!

IMG_1264.jpegIMG_1265.jpegIMG_1266.jpegIMG_1267.jpegIMG_1268.jpegIMG_1270.jpegIMG_1271.jpegIMG_1274.jpeg

Read more…

Kitchen remodel, day 2

Took delivery of the new cabinets. Actual install work hasn’t been scheduled; maybe Monday, maybe tomorrow, maybe in two weeks, who knows! Also this is real-life Sokoban. My little temporary kitchen becomes even more unwieldy. Guess I’ll be eating out for the next little while.

IMG_1248.jpegIMG_1249.jpegIMG_1250.jpegIMG_1251.jpegIMG_1252.jpeg

The end of two eras

Two things happened today of note:

  1. My new audio interface (affiliate link) arrived
  2. The demolition on my kitchen happened

Neither are things I really wanted to have to, y'know, spend this kind of money on right now, but they were both necessary. If badly-timed.

Read more…

Kitchen remodel, day 1

Demolition! Or: a farewell to shitty cabinets.

DSC07718.jpegDSC07719.jpegDSC07720.jpegDSC07721.jpegDSC07722.jpegDSC07723.jpegDSC07724.jpegDSC07725.jpegDSC07726.jpegDSC07727.jpegDSC07728.jpegIMG_1232.jpegIMG_1233.jpegIMG_1234.jpegIMG_1235.jpegIMG_1236.jpegIMG_1237.jpegIMG_1238.jpegIMG_1239.jpegIMG_1240.jpegIMG_1241.jpegIMG_1242.jpegIMG_1243.jpegIMG_1246.jpegIMG_1247.jpeg

Read more…

Kitchen remodel, day 0

Day 0: scrambling to move my stuff out of the kitchen because I found out demolition was going to happen the next day without warning

DSC07708.jpegDSC07709.jpegDSC07710.jpegDSC07711.jpegDSC07712.jpegDSC07713.jpegDSC07714.jpegDSC07715.jpegDSC07716.jpegDSC07717.jpegIMG_1231.jpeg

Read more…