Stuff and happenings

I’ve been accepted into Furality’s Dealer’s Den as a musician! I have a month to get my booth together and I’ve already got it like 90% done. It’s actually in an acceptable state already but there’s some more little things I want to do with the background video, and I’m learning so much DaVinci Resolve stuff to do it.

I also have a show on Sunday, at around 4:30 PM PDT. I hope folks can make it!

Read more…

Statuses

I’ve got stuff going on, figured I’d ramble a bit for those who care.

Read more…

More bathroom woes!

Okay so back in 2021 I had my bathroom redone, and the contractor did an awful job of it, and in particular the plumbing for the shower itself failed a bit over a year ago because the person who did the plumbing was super fucking incompetent.

So, I had to get the wall partially opened up to get the plumbing corrected, and the plumber was only able to do so much without completely demolishing all of the tilework, and was just hopeful that the fix would be long-term but said that the correct fix would have been very different.

The tile work itself wasn’t great either but it was Good Enough™ and I didn’t want to spend even more money to get it redone.

Wellp, today I noticed that I’m getting more leaking behind the shower wall! So that means that the proper fix needs to happen, which means the tile needs to come down, which means I’d might as well get all the tiling redone.

I’ve reached out to my usual good contractor to see if I can get an estimate for the retiling and the plumbing fix, and hopefully it won’t be too outrageous, but, jesus christ I’m so sick of dealing with this.

Bathroom hopeful conclusion

Oh yeah, earlier today the original contractor came by to look at things. He’s agreed to do the finishing-up work for free, and also will be reimbursing me for the plumbing expenses, which is very kind of him. When I showed him what his previous plumber had done he was incredibly shocked by it.

Hopefully the work will be finished up sometime in the next month; unfortunately he’s traveling soon and won’t be back for a few weeks, but he said he will hopefully be able to schedule someone to do the patching-up.

Fireplace done!

The fireplace work has finished, and conveniently today my firewood storage rack also arrived. The fellow recommended that I wait another 24 hours before lighting it up, though, as the cement needs time to cure.

I’m wondering what to do with the decorative logs that were left in the fireplace all this time. They were just like. Cutesy logs that were used as part of the home staging and got left behind.

I think these are them and the description says:

This is a natural product with zero chemical treatments or additives. This is a decorative product and not intended for burning, which could expose user to soot and carbon monoxide.

so I’m getting mixed messages here.

Read more…

Things and stuff

Bathroom

Plumbing was supposed to happen today but they somehow forgot to put me on the schedule. Which I found out when I’d called the plumber to find out when they were intending to start, and they had some more questions for me anyway, and it turns out they’d meant to send a new estimate based on what I’d figured out. Hopefully it’ll happen soon.

Fireplace

Fireplace work started today, but the fireplace folks still hadn’t gotten the liner purchased (and couldn’t get it because all the suppliers are still closed), so now I have a chimney with flashing and a crown but no cap, which means if it rains tonight there will be water inside, because for some reason the dude in his infinite wisdom didn’t even cover it with a tarp. Sigh. This particular fireplace contractor isn’t so great at the communicating.

But anyway the old chimney cap did come down and it’s incredibly rusted and shoddy and was very much falling apart so yeah, I’m glad this work got done when it did, before things got way, way worse.

3D printing

I was about to start a production run of the tamping stations, and my printer decided that this would be a perfect time for its bed leveling sensor to fail. So I switched back to my old Artillery Genius for now (oh god it is so slow and the bed is so small1) and spent all day trying to troubleshoot the sensor. Apparently there’s a pretty common problem with the X1C where the sensor’s cable (a $4 part) tends to fail weirdly. In this case, I think that when it recalibrated because of the firmware update, a marginal connection got shaken loose.

Anyway, so I ordered a $4 cable which had $7 shipping on it, so I ended up ordering a bunch of filament, and then discovered that I apparently have a Bambu filament membership? I’m not sure when I ended up with that. Was it something Bambu gave me for being a Kickstarter backer? I’m not finding any records in my email of having subscribed or being given it. Well, in any case, it means that Bambu’s branded filament is currently cheaper than my usual supplier anyway. But gosh I have a lot of filament now.

In any case, I’m thinking of ramping up my production which means it’d actually be beneficial for me to build an actual print farm, and I’m considering getting a Bambu P1P or P1S to supplement my X1C. But if I do end up pivoting into ceramics I don’t think more printers would be useful, since there my limiting factor is how many plaster molds I have in service and how much stuff I can load up in the kiln up the street.

Oh, and I got my first Etsy sale today! I hope the buyer is happy with their new Timemore catch cup.

Plumbing

I’m feeling like maybe I should have become a plumber, as I’m getting pretty good at figuring out what’s going on behind my shower (in ways that the plumbers who actually came out to look at it and give estimates on seem to have missed). It looks like the problem is just with the connection between the shower head and the valve. It’s possible that with the right tools it’d be possible to just open up the wall a little bit to gain access to the valve side of the pipe to tighten (and maybe re-tape) it, and then the shower head end might only need the drywall to be opened up to have that connection tightened as well. I might not need any retiling at all! That would be ideal, at least.

Anyway this is stuff to go over with the plumber next week.

The plumber who did the “quick fix” and diagnosis on tuesday, incidentally, made a couple of things a lot worse, and I just ended up having to replace my tub spout as well (because he installed it with loc-tite on the faucet end for some reason, even knowing that this was meant to be a temporary fix). Oh well, the one I replaced it with is much nicer looking. The pipe leading to it is a little bit too long now, though. Do I need to cut it down and get a threading tool or something?