Fireplace done!

Comments

The fireplace work has finished, and conveniently today my firewood storage rack also arrived. The fellow recommended that I wait another 24 hours before lighting it up, though, as the cement needs time to cure.

I’m wondering what to do with the decorative logs that were left in the fireplace all this time. They were just like. Cutesy logs that were used as part of the home staging and got left behind.

I think these are them and the description says:

This is a natural product with zero chemical treatments or additives. This is a decorative product and not intended for burning, which could expose user to soot and carbon monoxide.

so I’m getting mixed messages here.

Read more…

Things and stuff

Comments

Bathroom

Plumbing was supposed to happen today but they somehow forgot to put me on the schedule. Which I found out when I’d called the plumber to find out when they were intending to start, and they had some more questions for me anyway, and it turns out they’d meant to send a new estimate based on what I’d figured out. Hopefully it’ll happen soon.

Fireplace

Fireplace work started today, but the fireplace folks still hadn’t gotten the liner purchased (and couldn’t get it because all the suppliers are still closed), so now I have a chimney with flashing and a crown but no cap, which means if it rains tonight there will be water inside, because for some reason the dude in his infinite wisdom didn’t even cover it with a tarp. Sigh. This particular fireplace contractor isn’t so great at the communicating.

But anyway the old chimney cap did come down and it’s incredibly rusted and shoddy and was very much falling apart so yeah, I’m glad this work got done when it did, before things got way, way worse.

3D printing

I was about to start a production run of the tamping stations, and my printer decided that this would be a perfect time for its bed leveling sensor to fail. So I switched back to my old Artillery Genius for now (oh god it is so slow and the bed is so small1) and spent all day trying to troubleshoot the sensor. Apparently there’s a pretty common problem with the X1C where the sensor’s cable (a $4 part) tends to fail weirdly. In this case, I think that when it recalibrated because of the firmware update, a marginal connection got shaken loose.

Anyway, so I ordered a $4 cable which had $7 shipping on it, so I ended up ordering a bunch of filament, and then discovered that I apparently have a Bambu filament membership? I’m not sure when I ended up with that. Was it something Bambu gave me for being a Kickstarter backer? I’m not finding any records in my email of having subscribed or being given it. Well, in any case, it means that Bambu’s branded filament is currently cheaper than my usual supplier anyway. But gosh I have a lot of filament now.

In any case, I’m thinking of ramping up my production which means it’d actually be beneficial for me to build an actual print farm, and I’m considering getting a Bambu P1P or P1S to supplement my X1C. But if I do end up pivoting into ceramics I don’t think more printers would be useful, since there my limiting factor is how many plaster molds I have in service and how much stuff I can load up in the kiln up the street.

Oh, and I got my first Etsy sale today! I hope the buyer is happy with their new Timemore catch cup.

Fire place, fire sale

Comments

The fireplace work didn’t start today due to the rain. They originally rescheduled it for tomorrow but then the person scheduled for tomorrow got sick, so it’ll be Monday at the earliest. … And I just realized that means they scheduled it for Christmas, which seems weird. I’m guessing they’re going to start on Tuesday instead. Which is the same day the plumbers were planning to start on my bathroom. Oy.

Anyway, my big blue couch is finally gone, and so is my resin printer. Now I just need to do some more decluttering of my living room (and find a home for the crap that I was keeping on the surviving couch), and also figure out where the heck I’m going to keep my folding treadmill because it’s a little too tall to go under the red couch. I suppose I could prop it up by a couple inches with some riser feet or something but that feels iffy to me.

I had briefly thought I was going to maybe set up a gym space downstairs (for the treadmill and my DDR setup) but there just isn’t room for it down there either. The treadmill hasn’t really been all that enjoyable to use anyway, though, so maybe I’ll just sell it in January when everyone’s suddenly interested in getting exercise. For now it’s stashed awkwardly behind my couch, and preventing me from setting up my cozy fireplace area the way I want to.

Read more…

Another home project: fireplace

Comments

Another thing I’d been putting off way too long on this house was getting my fireplace evaluated, with a bunch of stuff that had been called out on the home inspection report.

Today I finally had a chimney inspector come out and he said that it’s in mostly good shape, but that the chimney cap would need to be replaced with a more modern crown, the flashing needs to be replaced, and of course the whole thing needs to be swept out. The estimate for all that came to be not a huge amount of money so I went ahead and scheduled that work too.

Read more…