Another day of remodeling!
Rambles that are fluffy, by fluffy
Another day of remodeling!
Today had some pretty big progress: countertops!
Not a lot of visible progress today, but a lot of progress has been made!
Things are continuing to go great and I am kind of annoyed at how impressed I am with how smoothly this one is going. Have I actually gotten a competent crew for once?!
I think this counts as day 4 (the “catastrophe” post having covered day 3). Things are going smoothly. In particular, some stuff finally arrived and things are moving floor-ward! I mean, forward.
So, almost every single home renovation project I’ve ever had has had something go very wrong.
In this one, everything’s been going quite smoothly, except:
Basically, if this can be the worst that happens on this project, I’ll be pretty happy. Thankfully it doesn’t seem like much else can go wrong, unless there’s some awful secret lurking in the laundry room (which is quite possible).
Oh yeah, I neglected to actually take photos of my kitchen in operation before I’d cleared everything out on day 0 (where it didn’t look so bad), but I did just go back through my photos to find some examples of what the kitchen was like under normal circumstances.
It’s day 2 of actual work on the kitchen. Whee.
I’m not sure why I’m calling this “Remodel II” because this is neither the second kitchen remodel I’ve gone through (it’s the fourth) nor the second I’ve had in this house. But it is the second one on this incarnation of my blog, so that’s probably it.
Anyway, today was demolition day.
Today I finished clearing out my kitchen getting ready for tomorrow’s demolition. Thankfully I actually had a few days to get it done this time, unlike last time when the contractor only let me know the demolition was going to happen at 5 PM the day before.
Because I had time to prepare it meant I could also actually do it in a semi-organized way. Which is good, because I have way less space for “staging” stuff in this house than I did in my last place.